Geothermal Power
Power  Demand vs supply & the price of exposure · unit of demand: MW of geothermal capacity
FCELORA
V2 · factsJun 2026
Sector scan: Energy & Power Group-level demand/supply Updated Jun 2, 2026 Facts only · no recommendation
Snapshot Product Demand Supply The gap The players The price Deep-dive next Sources

Snapshot

Geothermal power plants tap heat from below the earth's surface to spin turbines and generate electricity. Global installed capacity was 16,873 MW at end-2024, spread across 35 countries — roughly the output of 17 large nuclear reactors. The United States leads with 3,937 MW (23% of global), almost all in Nevada and California. The entire world added only 389 MW in 2024, a 2.4% growth rate. Unlike solar or wind, geothermal runs 24/7 at a 90%+ capacity factor, making it one of the few clean sources that can serve as genuine baseload. That property is now attracting data-center buyers: Google, Switch, and Meta have all signed geothermal PPAs since 2024. But the resource is geology-constrained, capital-heavy, and tiny relative to the power demand it is being asked to fill.

16.9 GW
Global installed geothermal capacity (end-2024)
3.97 GW
US installed geothermal capacity (end-2024)
389 MW
Global additions in 2024
~1,642 MW
New US geothermal PPAs signed since 2021
90%+
Typical capacity factor (vs ~25% solar, ~35% wind)
$63–$110/MWh
LCOE range — conventional flash to binary (NREL 2024)
The world has 16.9 GW of geothermal capacity and adds roughly 400 MW a year. US data-center operators have signed PPAs for over 1.6 GW of new geothermal — more than four years of the entire world's recent build rate. The supply chain and geology cannot deliver that on the timeline demand is requesting. The open question is whether enhanced geothermal (EGS) can break the bottleneck, or whether these contracts slip years.

Global capacity: ThinkGeoEnergy 2024 Top 10 report. US capacity and PPA data: NREL 2025 US Geothermal Market Report. LCOE: NREL 2025 US Geothermal Market Report (2022$). Capacity factor: US DOE Office of Geothermal.

The product & how money is made

A geothermal power plant drills wells into hot rock or hydrothermal reservoirs (typically 150–350°C), brings hot water or steam to the surface, and uses it to spin a turbine-generator. Two main technologies exist:

A third technology, Enhanced Geothermal Systems (EGS), uses horizontal drilling and hydraulic stimulation (techniques from oil & gas fracking) to create artificial reservoirs in hot dry rock. EGS dramatically expands the geographic footprint beyond volcanic regions. Fervo Energy (private) is the leader; Ormat has early-stage EGS pilots with SLB and Sage targeting 2–4 MW each, expected in 2027.

Revenue models

Technology descriptions: US DOE Office of Geothermal. LCOE ranges: NREL 2025 US Geothermal Market Report. Data center PPA pricing: ORA Q4 2024 earnings release (Feb 2025). Product backlog: ORA Q1 2025 earnings (May 2025).

Demand

Contracted demand contracted

Since 2021, 26 new US geothermal PPAs have been signed for over 1,642 MW of new capacity. The acceleration is driven by a 2021 California PUC order requiring utilities to procure 1,000 MW of "non-weather-dependent, non-battery, zero-emission energy," and hyperscaler demand for 24/7 clean baseload for data centers.

BuyerSellerMWDurationDelivery startsNotes
Google (via NV Energy)Ormat15015 yr2028–2030New build, Nevada, via Clean Transition Tariff
SwitchOrmat1320 yrQ1 2030Salt Wells plant upgrade, Nevada; Ormat's first direct DC PPA
Google (via NV Energy)Fervo (private)115~2028EGS, Nevada
Southern California EdisonFervo (private)32015 yr2026–2028EGS, Cape Station (Utah)
MetaSage Geosystems (private)150Next-gen geothermal

PPAs: Ormat investor releases (Jan 2026, 2026); DataCenterDynamics (Google/Fervo); ThinkGeoEnergy (Fervo/SCE); NREL 2025 US Geothermal Market Report (total PPA count + MW). Meta/Sage: NREL report.

Ormat also has ~190 MW of existing contracts expiring 2031–2034 at legacy rates averaging the "mid-$80s" per MWh that management plans to renegotiate at higher prices. The CD4 (Casa Diablo) contract was already extended through 2037 with a ~27% price increase.

Forecast demand est.

Data-center power demand in the US is projected to roughly double from ~25 GW today to 50–70 GW by 2030 est.. Geothermal's share will remain small in absolute terms but is growing from near-zero. US next-gen geothermal companies alone have attracted $1.5 billion+ in private capital since 2021, led by Fervo ($642M equity + $331M debt) and Eavor ($387M equity + $142M debt). The US DOE targets 2–5 GW of next-gen geothermal deployed across 4–6 states by ~2030 est., requiring $20–$25 billion in investment est., and envisions 90+ GW by 2050 est..

Supply

Installed capacity

CountryMW (end-2024)% of global
United States3,93723.3%
Indonesia2,65315.7%
Philippines1,98411.8%
Turkey1,73410.3%
New Zealand1,2077.2%
Kenya9855.8%
Others (29 countries)4,37325.9%
Global total16,873100%

ThinkGeoEnergy 2024 Top 10 Geothermal Countries report.

Bottlenecks

Ormat targets 2.6–2.8 GW total portfolio by end-2028, up from 1.8 GW today. That includes ~216 MW of geothermal/solar under construction or development and ~1.5 GWh of additional energy storage.

The gap

MetricDemand signalSupply realityGap
US data-center geothermal PPAs signed~750 MW0 MW delivered yetAll contracted capacity is 2026–2030 delivery
Total US geothermal PPAs since 20211,642 MW~300 MW added 2021–2024Pipeline is 5x recent build rate
DOE 2030 target (next-gen)2,000–5,000 MW est.~0 MW commercial EGS todayRequires technology step-change from pilot to commercial
Global annual additionsGrowing~400 MW/yr (2024)Not accelerating — same range as 2015–2023

Pricing direction

Geothermal PPA pricing is moving up. Ormat's CEO stated that data-center PPA negotiations are at rates exceeding $100/MWh, compared to legacy contract rates in the mid-$80s/MWh and a conventional LCOE of $63–$74/MWh for flash. The DOE projects next-gen geothermal LCOE can reach $60–$70/MWh by 2030 est. and the "Geothermal Shot" target is $45/MWh by 2035 est..

PPA pricing: ORA Q4 2024 earnings call. LCOE projections: US DOE Geothermal Liftoff Report (Sep 2024). Flash LCOE: NREL 2025 US Geothermal Market Report.

The players

Note on FCEL: FuelCell Energy is not a geothermal company. It makes molten-carbonate fuel cells — electrochemical devices that convert natural gas (or hydrogen) to electricity without combustion. It is included here because it competes for the same buyer (data centers wanting on-site, always-on, clean-ish baseload power).

MetricORA (Ormat Technologies)FCEL (FuelCell Energy)
What they sellGeothermal electricity (IPP) + geothermal equipment (EPC) + energy storageMolten-carbonate fuel cells (behind-the-meter power from natural gas)
TechnologyBinary-cycle geothermal (proprietary Organic Rankine Cycle turbines)Carbonate fuel cells — electrochemical, not combustion
Market cap$8.9B$1.3B
Stock price$144.48$24.64
Shares outstanding61.5M52.9M
FY revenue$880M (CY2024)$158M (FY Oct 2025)
Net income$124M (CY2024)-$188M (FY Oct 2025)
Adj. EBITDA$551M (CY2024)Negative
Gross margin~37% (electricity segment)-17%
Operating cash flow$411M (CY2024)Negative (~-$148M FCF, FY2025)
Cash on hand$763M (Q1 2026)$312M
Total debt~$3.4B (Q1 2026)$150M
Book value (equity)$2.55B$764M
Owned capacity1,340 MW geothermal/solar + 495 MW storage = 1.8 GW~100 MW installed in South Korea; cumulative ~1 GW deployed since 2003 (including replacements)
Backlog$314M (product segment, May 2025)$1.19B (total, Oct 2025)
Data center pipeline~200 MW signed (Google 150MW, Switch 13MW, others); +100 MW recontract potentialPipeline up 275% since Feb 2025; 12.5 MW packaged power block announced Mar 2026
2028 target2.6–2.8 GW total portfolioManufacturing: 100 MW → 350 MW capacity (Torrington, CT)
Dividend$0.48/yr (0.33% yield)None
ProfitabilityProfitable since founding; 62.6% EBITDA marginNever profitable; negative gross margins every year since FY2021
DilutionModest (convertible notes)1-for-30 reverse split Nov 2024; shares up 83% YoY via issuance

ORA financials: Q4 2024 and Q1 2026 earnings releases; StockAnalysis.com (cash flow). FCEL financials: 10-K FY2025 (Oct 2025); StockAnalysis.com (income statement, statistics). Stock prices: Jun 2, 2026. Capacity: ORA corporate profile (1.8 GW); FCEL 2025 annual report (approaching 1 GW cumulative, ~100 MW in South Korea).

Key private competitors

The price of exposure

Ormat Technologies (ORA) — $144.48/share

MetricValueNote
Market cap$8.9B61.5M shares x $144.48
Enterprise value~$11.5B$8.9B + $3.4B debt - $0.76B cash
EV / EBITDA (FY2024)~20.8x$11.5B / $551M
EV / 2026 EBITDA guide~18.2x$11.5B / $630M midpoint
P/E (trailing)69.7x$8.9B / $124M net income (CY2024)
P/E (Q1-2026 adj. annualized)~27.7x est.$8.9B / ($80.3M adj. NI x 4)
Price / book3.5x$8.9B / $2.55B
Dividend yield0.33%$0.48/yr
Revenue growth (Q1-2026 YoY)+75.8%Driven by product segment spike ($177M vs $25M)
Net debt / EBITDA4.2xManagement-reported (Q1 2026)
1-year stock price change+96%Data-center narrative re-rating

At $144, the enterprise value is ~$11.5B for a business guiding to ~$630M adjusted EBITDA in 2026 and targeting ~$800M+ by 2028 if capacity grows to 2.6–2.8 GW est.. The electricity segment generates $700M+ in steady recurring revenue with ~37% gross margins under long-term contracts. Free cash flow has been negative because capex ($488M in 2024) exceeds operating cash flow ($411M), though the gap is narrowing as capacity comes online.

FuelCell Energy (FCEL) — $24.64/share

MetricValueNote
Market cap$1.3B52.9M shares x $24.64
Enterprise value$1.14B$1.3B + $150M debt - $312M cash
EV / Revenue (TTM)6.7x$1.14B / $170M est.
P/EN/ANo earnings — net loss of $188M (FY2025)
Price / book1.7x$1.3B / $764M
Cash remaining$312MNet cash position: $162M after debt
Annual cash burn~$148MNegative FCF (FY2025)
Cash runway~2 years est.At current burn without further dilution
Shares outstanding change+83% YoYAfter 1-for-30 reverse split (Nov 2024), then continued issuance

FCEL trades at $1.3B market cap with a $188M/yr net loss and negative gross margins. The $1.19B backlog provides a demand signal, and the 12.5 MW data-center power block (announced March 2026) could shift unit economics if costs come down at scale. Manufacturing expansion from 100 MW to 350 MW is planned but unfunded from operations. At current burn, cash lasts roughly two years without further dilution est..

Stock prices and shares: StockAnalysis.com (Jun 2, 2026). ORA financials: Q1 2026 and FY2024 earnings releases. FCEL financials: 10-K (FY ending Oct 2025), StockAnalysis.com income statement + statistics. Reverse split: FCEL press release Nov 7, 2024.

What to deep-dive next

Sources & confidence

FactSourceConfidence
Global geothermal capacity (16,873 MW)ThinkGeoEnergy 2024 Top 10 reportverified
US geothermal capacity (3.97 GW) and PPA data (1,642 MW)NREL 2025 US Geothermal Market Reportverified
ORA FY2024 financials ($880M rev, $124M NI, $551M EBITDA)ORA Q4 2024 earnings release (Feb 2025)verified
ORA Q1 2026 financials ($404M rev, $195M adj. EBITDA, 1.8 GW portfolio)ORA Q1 2026 earnings release (May 2026)verified
ORA data-center PPAs (~200 MW, >$100/MWh pricing)ORA Q4 2024 & Q1 2026 earnings callsverified
ORA operating cash flow ($411M) and capex ($488M) for CY2024StockAnalysis.com (sourced from 10-K)verified
FCEL financials ($158M rev, -$188M NI, $312M cash, $150M debt)FCEL 10-K FY Oct 2025; StockAnalysis.comverified
FCEL $1.19B backlog, 12.5 MW power block, manufacturing expansionFCEL press releases (Feb & Mar 2026)verified
FCEL reverse split (1-for-30) and 83% share dilutionFCEL press release (Nov 2024); StockAnalysis.comverified
Fervo Energy PPAs (320 MW SCE, 115 MW Google, 400 MW Cape Station)ThinkGeoEnergy; NREL 2025 report; GP-Radarverified
Conventional geothermal LCOE ($63–$110/MWh)NREL 2025 US Geothermal Market Reportverified
DOE EGS LCOE targets ($60–70/MWh by 2030, $45/MWh by 2035)US DOE Next-Gen Geothermal Liftoff Report (Sep 2024)est. — targets, not actuals
DOE 90+ GW by 2050 projectionUS DOE Liftoff Reportest. — aspirational scenario
Private investment ($1.5B+ since 2021)NREL 2025 US Geothermal Market Reportverified
Data-center power demand doubling to 50–70 GW by 2030Industry consensus estimates (multiple sources)est.
ORA ~$800M+ EBITDA by 2028Extrapolation from management 2.6–2.8 GW targetest.